GÅ 100% GRØNT OG BÆREDYGTIGT
IKKE MERE KEMIKALIER

New and stronger 2023 model

ALPHA mod.
Quattro-DB® MAX 4-ways

The MAX transducer is the premium system to prevent growth in the irrigation reservoir dam
og
it’s the only way to replace expensive and dangerous chemicals.


Rental option is available

AQUARIUS TECHNOLOGIES TESTING ALPHA ON WATER TREATMENT PLANT IN LABORATORY
www.aquariustect.com.au


Heavy algae and green plants in waterways under the plants growing in water without soil.

Pictures taken December 2021 – results 3 uger efter installationen.

Pictures: ALPHA 2-ways installed the 15.11.2021
in Spice plants at Aquarius Technology Laboratory to prevent clogging of filters

Water used for irrigation can contain high levels of nutrients, some of these nutrients
are beneficial for the plants, but can also lead to extensive algae growth.

Algae in irrigation reservoirs can clog the irrigation system and can also be spread over the irrigated area.
In addition, some types of fungus also present in these waters can be extremely harmful for the plants grown.

Biofilm blockage inside T-tape

Bio film and algae from the irrigation dam dripper blocks and clogs inside the Drip line.
The only sustainable and 100% Green solution to solve the problem is ALPHA 4-ways ultrasound system.

Bio film and algae clogging inside T-tape tube prevent free and full waterflow to VEGETABLE soil.
The only sustainable and 100% Green solution to solve the problem is ALPHA 4-ways Ultrasound system.

ALPHA 4-ways ultrasound system in the irrigation reservoir is the only way to replace expensive and dangerous chemicals.
Ultrasound reduces odor, avoids algae in irrigation dams, dripper blockage and fouling, bakterie, bio film and algae
clogging inside T-tape, Drip-line, water reservoirs, waterways, inside irrigation pipes and blocking irrigation drippers.

STACKHEAD FARM GOLD COAST
IS ALSO ONE OF OUR ALPHA ULTRASOUND CUSTOMERS

INTERNET PICTURE (NOT FROM THIS PLANT)


WEED PROBLEMS IN FARMERS IRRIGATION DAM IN GATTON QLD

The problem was so massive weed growth in their irrigation dam
so they couldn’t use the dam because the weed blocked the sand filter.


Before they install ALGAEFREE in November 2022, they first had to clean up the dam for weed.

Picture with ALPHA ultrasound system 1 year later.

The water is still clear, the plant growth is gone and no more weed problems.
The same farmer in Gatton QLD ordered in 2024 the same system for another irrigation dam with the same problem.

The WINERY industry has the same problem in their irrigation dam.

The great PIRRAMIMMA Winery, McLaren Vale, South Australia installed ALGAEFREE model ALPHA 4-ways in August 2021.
PIRRAMIMMA Winery installed the ALPHA 4-ways and solved all the problems in 3 uger

Billede nr 1 is taken in August (efter 5 dage) når ALPHA starter processen med at rense vandet.
Billednummer 2 tages efter 10 days and shows how ALPHA is clogging the algae and working its way through dislodging.
Billede nr 3 is taken in September and shows the way ALPHA is breaking down clogging into smaller algae clumps.
Billede nr 4 is taken in September and shows the result with ALPHA 4-ways Ultrasound System 3 uger efter installationen.

Rul til toppen